HAPPY THANKSGIVING
Hope everyone has had a great Thanksgiving. Ours was great.
November has been a busy month. We went back to the Mississippi Gulfcoast for another Build. Our church sent people there for two weeks to do interior work on a new house in Gulfport. I was there for two weeks (Nov. 4-17) and Nancy was there for the last week (Nov. 11-17). In addition to the interior work we built an "L" shaped deck on the house. The exterior of the house was completed with the exception of the deck/porch. The interior walls, electrical, plumbing, and HAVC were installed. Some of the installation and drywalling had been installed. When we left all rooms except one had been Spackled sanded and painted. Linoleum tile flooring had been installed kitchen and bathroom cabinets and fixtures had been installed. Interior doors and molding around doors and windows had been installed. Our client has been living in a FEMA trailer for two years. She will be in her new house Christmas.
November has been a great month.